SE3010
Software Design Lab

Introduction

In this sprint, you will define the scope of your projec through the develepoment of mock-ups and explore key technologies through individual technical spikes.

Please see the shared syllabus for an overview of the process.

In particular, please review Weeks 1-4 on the schedule, as these give an overview of the deliverables for the first sprint

Deliverables

Individual Technology Spikes

Each student should arrange an individual meeting with the instructor, preferably during the last week of the Sprint (Week 4), but also possibly during the week that follows (Week 5). These do not need to be demoed to the product owner.

If you anticipate not being able to complete your technical sprint, please contact me at the beginning of Week 4 to arrange details.

By Monday of Week 5, each student will submit a brief report documenting:

  • the goal
  • technologies tried and used
  • how to build the system and test that it works
  • lessons learned

This report will be submitted to esubmit as a PDF.

Other Deliverables

All items on Weeks 1-4 on the schedule are due Monday night of Week 5. Work ahead!

Templates for Review and Retrospective Reports

Sprint Review and Retrospective Elements

Assessment Rubric

Functionality 30%
Completion 30%
Documentation 30%
Following instructions 10%
Total 100%